Discussion Board
In this unit I did a foundation plan for the Mason residence. Some of the project was already done from unit 11. The walls above section was already done from unit 11. After I removed every layer except wall studs, I copied the floor plan to the foundation box. The layer used was F-Walls Above. After this I did concrete which took me longer than anything else because I messed up. The layer used was F-Concrete and the structural material was concrete. The next step was footing. This was by far the easiest part to me. The layer used was F-Footing and the structural material was concrete. The next step was beams and columns. This step did not take that much time. The last two steps were dimensions and notes. These were simple steps compared to the others. The layers were F-Dimension and F-Notes. This was a goof unit because it is interesting to know what the building is on top of.